Kingy’s Diesel Industries were approached by Essential Energy to assist them with their MLO major inspection project.
Service providers were given a strict list of safety requirements and client upgrades. In accordance with Kingy’s Diesel Industries and Premier Proline, a work scope was designed and followed by Kingy’s Diesel Industries with an in-depth variance of work.
Robway upgrades included proximity switches on outrigger legs and slope level upgrades. The finished product was inspected by Essential Energy before going back into the workforce. Take a look at the photos to see before and after.